Building Materials Supply Chain · China

Your Project.
Our Supply Chain.
Controlled.

We source, inspect, and deliver building materials from verified Chinese factories — coordinated around your construction schedule, delivered worldwide.

38+
Verified Factories
15+
Countries Served
24h
Response Time
🏗️ Kigali, Rwanda — Residential Project
67 units · 4 phased shipments · CIF Mombasa
Delivered
🔍 Pre-Shipment QC Active
All batches inspected before leaving China
Live
📦 Phased Delivery System
Materials arrive aligned to your build schedule
Our Edge
Trusted by project teams in
🇻🇳 Vietnam 🌏 Southeast Asia 🇸🇦 Middle East 🌍 Africa 🇪🇺 Europe 🇦🇺 Australia
Factory Quality Control
🏭 38 Verified Factories
Factory Sourcing

Not Alibaba.
Pre-Audited Partners.

Every factory in our network has been personally assessed — license validity, production capacity, export history. We match you to a factory we already know and trust.

Building materials only. Our team understands ceramic tile specs, steel door grades, and sanitary ware certifications at a level general agents cannot match.

See How We Source →
The Challenge

Sourcing from China is full of hidden risks

Construction projects can't afford surprises. Here are the four problems most buyers face — and how we solve each one.

01
🏭
Unreliable Factories

Thousands of suppliers claim to be manufacturers. Without boots on the ground, you can't tell who is real.

→ We pre-audit every factory in our network
02
⚠️
Quality Doesn't Match the Sample

The sample is perfect. The bulk order arrives different. Substandard materials mean rejected shipments and costly rework.

→ We inspect every batch before it ships
03
🚢
Delivery Doesn't Match Your Schedule

Materials arrive too early (storage cost) or too late (project stops). Construction timelines are fixed — logistics must adapt.

→ We align deliveries to your build phases
04
📋
Documentation & Compliance Gaps

Missing certificates and wrong customs codes cause costly port delays. International projects need precise documentation.

→ We prepare all export and import docs
Container Shipping
🚢 CIF — Door to Port
Phased Logistics

Delivered when you need it.
Not all at once.

We coordinate shipments around your construction schedule. Phase 1 materials arrive when Phase 1 begins — eliminating storage costs and schedule risk.

Sea, air, or rail. 20ft CIF ~$1,290 · 40HQ CIF ~$1,948 to HCMC. Full customs documentation prepared and included.

Calculate Your Shipment 🔥
What We Supply

Building Materials We Source

See All Products →
Tiles
Tiles & Flooring
From $0.40/pc CIF
Doors
Steel & PVC Doors
From $29.80/unit CIF
Sanitary
Sanitary Ware
From $18.01/unit CIF
SPC Flooring
SPC Flooring
From $7/sqm CIF
Ready to Start?
Tell us about your project.
We'll handle the rest.

Share your material list and project timeline. We respond within 24 hours with a sourcing plan and indicative pricing.

💬